Home Electrification Physics for Switzerland

PVGIS 5.3 (Dietikon 1,152 kWh/kWp); Ember 2025 (39 g) & VSE 2024 consumer mix (57 g); ElCom 2026 H4 (29.9 Rp); BFS gas (14.3 Rp); HeizOel24 oil (14.1 Rp); EnergieSchweiz 2025 PV median; Pronovo EIV. Data checked 2026-11-28.

In plain English for Switzerland: Typical rooftop solar panels here pay back in roughly 11.8 years, while a 10 kWh home battery adds about CHF 381/yr (worth up to CHF 4'569 over a 12-year warranty). For heating, a heat pump beats gas whenever its yearly efficiency (SCOP) is above 1.88, and a 64 kWh electric car clears its battery carbon footprint in 28,026 km (1.9 years).

6 kWp Solar Yield
6,910 kWh/yr
270 kg CO2e/yr displaced
Grid Carbon Mix
57 g/kWh
Ember 2025 (prod 39 g)
Heat Pump Break-Even
SCOP 1.88
Spark gap 2.09x (45C SCOP 3.28)
EV Carbon Payback
28,026 km
11 vs 182 g/km petrol

Key Reference Numbers for Switzerland (Checked 2026-11-28)

ParameterValueSource & Reference Year
Electricity import rate0.299 CHF/kWhElCom 2026 median H4 (27.70 Rp excl. VAT = 29.9 Rp incl. 8.1% VAT)
Solar export feed-in0.072 CHF/kWhEKZ 2026 BFE quarterly reference (min 6.0 Rp <30 kW, + up to 3.0 Rp HKN)
Natural gas / Heating oil0.143 / 0.141 CHF/kWhBFS / HEV Oct 2026 (CHF 0.1430/kWh)
Petrol / Diesel1.78 / 1.84 CHF/LPump price reference (2026-11-28)
Grid carbon intensity57 g CO2e/kWhEmber 2025 production 39 g; VSE 2024 consumer mix 57 g (default for EV/HP)
Turnkey PV median (p25-p75)2,330 (2,050-2,750) CHF/kWpEnergieSchweiz PV price study 2025 (10 kWp median CHF 21,558 excl. VAT ~ CHF 2,330/kWp incl. 8.1% VAT)
Heat pump install (Air / Ground)32,000 / 48,000 CHFTypical turnkey before grants; boiler repl. ~14,000 CHF
PV & Heat pump grantsLocal rulesPV: Pronovo EIV one-time grant (CHF 360/kW attached, residential <30 kW, 30% cap, since 2025-04-01). HP: Cantonal Building Programme (varies by canton; ~CHF 4,000-8,000 typical).

What makes the biggest difference in Switzerland

In Switzerland, an optimally tilted 6 kWp rooftop array produces roughly 6,910 kWh per year (city benchmarks: Dietikon, ZH (1152 kWh/kWp), Zurich (1155 kWh/kWp), Bern (1238 kWh/kWp), Basel (1140 kWh/kWp), Lugano (1327 kWh/kWp), Sion (1419 kWh/kWp)). At the regional turnkey median of 2,330 CHF/kWp, panels alone pay back in roughly 11.8 years on a 5,000 kWh/yr household profile. Adding a 10 kWh battery raises self-sufficiency and saves an extra CHF 381/yr, making the battery's 12-year break-even negotiation ceiling about CHF 4'569. Plug-in balcony solar is capped at 600 W inverter output.

For home heating, the electricity-to-gas Spark Gap is 2.09x, meaning an air-to-water heat pump beats a 90%-efficient condensing gas boiler on running cost whenever real Seasonal COP exceeds 1.88. With low-temperature 45°C radiators (modeled SCOP 3.28 adjusted for 3350 heating degree days), the headline verdict is: Cheaper to run, from year one..

For personal transport, Battery carbon debt (4.8 t CO2e) is paid off in 1.9 years (28,026 km) in Switzerland. Adding even 30% home solar charging (45 g CO2e/kWh lifecycle) accelerates both financial and carbon payback further.

Frequently Asked Questions (Switzerland)

Is a home solar battery worth it in Switzerland?
For a typical 6 kWp roof and 5,000 kWh annual load in Switzerland, panels alone pay back in about 11.8 years, while a 10 kWh battery adds about CHF 381/yr in savings. Over a 12-year warranty, the battery's break-even price is roughly CHF 4'569.
What heat pump efficiency (SCOP) beats gas in Switzerland?
At 0.299 CHF/kWh electricity and 0.143 CHF/kWh gas, the Spark Gap is 2.09x. Against a 90%-efficient condensing gas boiler, a heat pump costs less to run whenever real SCOP exceeds 1.88. Well-sized 45C radiators average about 3.28 SCOP here.
How many kilometers until an EV pays back its battery CO2e in Switzerland?
Using 57 g CO2e/kWh, a 64 kWh EV emits about 11 g/km versus 182 g/km for a 6.8 L/100 km petrol car, paying off its 4.8 t battery manufacturing footprint in 28,026 km (1.9 years).