Home Electrification Physics for Switzerland
PVGIS 5.3 (Dietikon 1,152 kWh/kWp); Ember 2025 (39 g) & VSE 2024 consumer mix (57 g); ElCom 2026 H4 (29.9 Rp); BFS gas (14.3 Rp); HeizOel24 oil (14.1 Rp); EnergieSchweiz 2025 PV median; Pronovo EIV. Data checked 2026-11-28.
In plain English for Switzerland: Typical rooftop solar panels here pay back in roughly 11.8 years, while a 10 kWh home battery adds about CHF 381/yr (worth up to CHF 4'569 over a 12-year warranty). For heating, a heat pump beats gas whenever its yearly efficiency (SCOP) is above 1.88, and a 64 kWh electric car clears its battery carbon footprint in 28,026 km (1.9 years).
Key Reference Numbers for Switzerland (Checked 2026-11-28)
| Parameter | Value | Source & Reference Year |
|---|---|---|
| Electricity import rate | 0.299 CHF/kWh | ElCom 2026 median H4 (27.70 Rp excl. VAT = 29.9 Rp incl. 8.1% VAT) |
| Solar export feed-in | 0.072 CHF/kWh | EKZ 2026 BFE quarterly reference (min 6.0 Rp <30 kW, + up to 3.0 Rp HKN) |
| Natural gas / Heating oil | 0.143 / 0.141 CHF/kWh | BFS / HEV Oct 2026 (CHF 0.1430/kWh) |
| Petrol / Diesel | 1.78 / 1.84 CHF/L | Pump price reference (2026-11-28) |
| Grid carbon intensity | 57 g CO2e/kWh | Ember 2025 production 39 g; VSE 2024 consumer mix 57 g (default for EV/HP) |
| Turnkey PV median (p25-p75) | 2,330 (2,050-2,750) CHF/kWp | EnergieSchweiz PV price study 2025 (10 kWp median CHF 21,558 excl. VAT ~ CHF 2,330/kWp incl. 8.1% VAT) |
| Heat pump install (Air / Ground) | 32,000 / 48,000 CHF | Typical turnkey before grants; boiler repl. ~14,000 CHF |
| PV & Heat pump grants | Local rules | PV: Pronovo EIV one-time grant (CHF 360/kW attached, residential <30 kW, 30% cap, since 2025-04-01). HP: Cantonal Building Programme (varies by canton; ~CHF 4,000-8,000 typical). |
What makes the biggest difference in Switzerland
In Switzerland, an optimally tilted 6 kWp rooftop array produces roughly 6,910 kWh per year (city benchmarks: Dietikon, ZH (1152 kWh/kWp), Zurich (1155 kWh/kWp), Bern (1238 kWh/kWp), Basel (1140 kWh/kWp), Lugano (1327 kWh/kWp), Sion (1419 kWh/kWp)). At the regional turnkey median of 2,330 CHF/kWp, panels alone pay back in roughly 11.8 years on a 5,000 kWh/yr household profile. Adding a 10 kWh battery raises self-sufficiency and saves an extra CHF 381/yr, making the battery's 12-year break-even negotiation ceiling about CHF 4'569. Plug-in balcony solar is capped at 600 W inverter output.
For home heating, the electricity-to-gas Spark Gap is 2.09x, meaning an air-to-water heat pump beats a 90%-efficient condensing gas boiler on running cost whenever real Seasonal COP exceeds 1.88. With low-temperature 45°C radiators (modeled SCOP 3.28 adjusted for 3350 heating degree days), the headline verdict is: Cheaper to run, from year one..
For personal transport, Battery carbon debt (4.8 t CO2e) is paid off in 1.9 years (28,026 km) in Switzerland. Adding even 30% home solar charging (45 g CO2e/kWh lifecycle) accelerates both financial and carbon payback further.
Frequently Asked Questions (Switzerland)
- Is a home solar battery worth it in Switzerland?
- For a typical 6 kWp roof and 5,000 kWh annual load in Switzerland, panels alone pay back in about 11.8 years, while a 10 kWh battery adds about CHF 381/yr in savings. Over a 12-year warranty, the battery's break-even price is roughly CHF 4'569.
- What heat pump efficiency (SCOP) beats gas in Switzerland?
- At 0.299 CHF/kWh electricity and 0.143 CHF/kWh gas, the Spark Gap is 2.09x. Against a 90%-efficient condensing gas boiler, a heat pump costs less to run whenever real SCOP exceeds 1.88. Well-sized 45C radiators average about 3.28 SCOP here.
- How many kilometers until an EV pays back its battery CO2e in Switzerland?
- Using 57 g CO2e/kWh, a 64 kWh EV emits about 11 g/km versus 182 g/km for a 6.8 L/100 km petrol car, paying off its 4.8 t battery manufacturing footprint in 28,026 km (1.9 years).